The critical path for the network activities shown below is _____ with duration ______.
A. A-C; 12
B. A-D-E; 19
C. B-E; 13
D. A-B-C-D-E; 29
E. none of the choices

Respuesta :

Otras preguntas

Drako found an emerald in a cave at a depth between Negative one-half and Negative 1 and two-thirds meters. Which number could represent the depth at which the
What are the homogeneous subsection within a large and complex society called? A) high cultures B) cultural universals C) subcultures D) low cultures
Which did President Carter do in his attempt to free American hostages taken by Iran?
List several websites you use for school for entertainment or for playing games​
The sum of three numbers is 78. The third number is 7 more than the first. The second number is 3 times the third. What are the numbers?
can someone please ASAP​
which is not one of the color models you can work with in inkscape RGB HSL RYB CMYK
Are they correct? Why or why not? answer correctly thank you 10 points.
what is the volume of a cone with a base radius of 5 m and a height of 12 m
Target is seeking a new distribution system because A. competition from Amazon and Walmart is intense. B. it needs to speed up restocking. C. it wants to reduce