shyannehamilton3344 shyannehamilton3344
  • 22-04-2024
  • Engineering
contestada

The following are the current state cycle time for different operations in a process. Use the principles of line balancing to determine the theoretical number of work stations required for the process. Given the takt time is 40s. Operations 1 to 5 cycle time in seconds is
A) 20,
B) 15,
C) 25,
D) 30,
E) 45

Respuesta :

Otras preguntas

a kitten weighs 500g. a puppy weighs 2kg. Wich weighs more how much more
a what can be the intermediate stage of speciation?
A box has a volume given by the trinomial x^3 + 5x^2 -24x What are the possible dimensions of the box?
is 2/5 the same as 0.25
Help with past, present and future tense in French? So, I need to learn the "all the tenses" but I really don't know where to begin. Help?
Can someone PLEASE explain to me how the integral of 2cos^2(t)sin(t) dt =-(2/3)cos^3(t) ???
what ifluenced australia to start a goverment???
How did speculators take advantage of the Homestead Act?
what is another name for a route of water?
James has a board that is 3/4 foot long . He wants to cut the board into pieces that are each 1/8 foot long . How many pieces can James cut ? Explain how James