contestada

a construction company can remove 2/3 tons of dirt from construction site each hour how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Goldenpineapple123
Goldenpineapple123 Goldenpineapple123
  • 22-06-2018
You would want to divide 30 by 2/3 so you would do 30/1 times 3/2. This method is known as keep change flip or kcf (Kentucky Chicken Fried is what some people say) your final answer should come out to 90/2 which simplified is 45. Hope this helped
Answer Link

Otras preguntas

After a rock is rounded how does weathering affect it
A 100 centimeter stick broke into 3 pieces one piece was 7 centimeters long and another was 34 centimeters long how long was the third piece
What is the initials for sodium chloride
$10 + ($6-n) if n =$3 What is the final product Of this mathematical question?
A drawing of a surfboard in a catalog shows it's length as 8 4/9 inches. Find the actual length of the surfboard if 1/2 inch length on the drawing corresponds t
A drawing of a surfboard in a catalog shows it's length as 8 4/9 inches. Find the actual length of the surfboard if 1/2 inch length on the drawing corresponds t
what is the answer to 3p-5>2p+p-7
Sylvan withdrew 2/5 of the amount in his savings account, and spent 7/10 of that money.  What fraction of his total savings does he still have?
the kind of lake that formed when a river meanders
the school marching band has 36 members. the band director wants to arrange the band members into a square formation. how many band members should be in each ro