QueenChibi8303 QueenChibi8303
  • 26-02-2019
  • Business
contestada

Should project managers force team members to report progress of their activities accurately?

Respuesta :

MrCreighton
MrCreighton MrCreighton
  • 26-02-2019

Yes, project managers should require accurate reporting so that they can ensure accountability. Managers will need to make sure the project and team members are on task and one time. If there is incorrect information, this would be hard to do.

Answer Link

Otras preguntas

Daniel has a sample of pure copper. Its mass is 89.6 grams (g), and its volume is 10 cubic centimeters (cm3). What’s the density of the sample? 0.11 g/cm3 8.96
How many Patriot POWs are imprisoned in Prison Ship in New York harbor? how many died?
What process is considered to be growth when it occurs in multicellular organism reproduction when it occurs in a unicellular organism ?
_________ forests stay green all year. a.tundra b.coniferous c.mixed d.deciduous
Mitch is cutting wood to make a garden marker each garden marker changes the length of the piece of wood by -0.8 foot the length of the wood changes by a total
Jacksons family drove 496 in 8 hour what is the unit rate
Write the number 7/10 as a decimal and describe the process
why is aluminium smelting industry close to power sector? describe other important factors necessary for location of aluminium smelting industry. why is this in
In an blank , the apostrophe replaces one or more letters that have been left out.
The motion of a girl riding a farris wheel is called