Seudónimo Seudónimo
  • 22-08-2016
  • Mathematics
contestada

Alonso runs a company called Speedy Houses Painters. His workers can paint 3/4 of a house in one day. How many days would it take them to paint 6 houses?

Respuesta :

YosairiBeltran
YosairiBeltran YosairiBeltran
  • 23-08-2016
Divide 3/4 =75
Take that 75 multiply by 6
75•6=450
Answer Link

Otras preguntas

The sum of two numbers is 9191. the difference between them is 4545. find the two numbers.
An acyclic hydrocarbon with the formula c20h34 has how many pi bonds
In order to determine whether or not a precipitate formed at the end of a double-replacement reaction, you need to know if the compounds are
Explain the function of stomata in a plant.
Who married Lincoln and who shoot him?????
A baby elephant weighs 250 pounds on Earth. How much would this elephant weigh on Saturn? Give your answer in newtons (4.48 newtons = 1 pound).
What are three elements that have similar chemical properties to oxygen
Research studies are superior to personal experience because
The oviedo thespians are planning to present performances of their florida revue on 2 consecutive nights in january. it will cost them​ $5,000 per night for the
The fundamental goal of the framers of the 1876 constitution was to weaken and ___________ the state's government and institutions.