upsups561 upsups561
  • 23-05-2022
  • Business
contestada

A comparison between actual and projected expenditures is called.

Respuesta :

martynaloafsuj
martynaloafsuj martynaloafsuj
  • 23-05-2022

Answer:

variance analysis

Explanation:

a comparison between actual and projected expenditures is called variance analysis

Answer Link

Otras preguntas

A triangle has side lengths of 13 in, 29 in, and 30 in. Classify it as acute, obtuse, or right.
MAKE SURE TO SHOW YOUR WORK (please)
Help extra points and mark brainlist
A. Identify FOUR countries that include parts of Sápmi. B. If Sápmi existed as a separate state, identify the type of morphology that would best describe it. C.
Which of the following correctly identifies the three principles in the Pledge of Allegiance to the Georgia Flag? A.wisdom, justice, and moderation B.liberty,
Gordon has $395 in credit card debt. If Gordon makes no payments, his debt will increase by 2.5% each month. Which function can be used to find the amount of de
What is m<1 and m<2
? In Kite VSTU where diagonals meet at point P, VP = 9 in, and US = 52 in. What is the area of the kite? S V Р T А 468 in? B 234 in? C 936 in? D 122 in
The bank does not charge a fee for cashing checks as long as members keep a balance, b, of at least $500 in their checking account. Write an inequality that rep
1. The Hamiltons are installing a new pool in their backyard. The scale drawing below represents the new pool, where 1 centimeter represents 5 feet. 4 cm 6 cm I