ngocnhi5987 ngocnhi5987
  • 24-10-2017
  • Business
contestada

Johnson's rule gives optimal answer for what type of scheduling problems?

Respuesta :

Etta217
Etta217 Etta217
  • 06-11-2017
The answer is two-machine flow shop. The two-machine flow shop issue in which each activity is prepared through an in-house framework or outsourced to a subcontractor. A calendar is set up for the in-house employments, and execution is measured by the makespan.
Answer Link

Otras preguntas

what famous ancient greek mathematician came up with an approximate value of pi by circumscribing and inscribing circles in and around regular polygons?
the product of two consecutive positive even integers is 14 more than their sum
Compare and contrast centipedes and millipedes
How can you tell when a solution is formed?
A worker is hired for $80 a day on the condition that if business is slow, the worker will only receive half pay.  At the end of 20 days, the worker receives $1
What is foreshadowing?
How did the colonists justify their protests and ultimate rebellion ?
NaHCO₃ is a. a strong acid b. a strong base c. a weak acid d. a weak base e. a salt (made from an acid and a base)
Whats the answer to 45=x(14-x)
How do you find the sum of 4/10 and 55/100?