austinhale7329 austinhale7329
  • 24-11-2017
  • Business
contestada

An event that must occur in order for a party's duty to arise is called a(n) ________________.

Respuesta :

meerkat18
meerkat18 meerkat18
  • 05-12-2017
This is what they call condition precedent. The party's task to perform arise after a specific event happens. However, when the event never happens, the duty of the party to perform will never arise. The parties are discharged from the contract. 
Answer Link

Otras preguntas

World War 1 SC Compare/Contrast the SC of Reconstruction the the SC of post WWI both socially and economically. thx
Which decorative items from this chapter would not be acceptable to use in making a showpiece that must be entirely edible? chapter 20 chocolate and sugar work
2.3 This flow diagram shows the cost of candles at the shop. Calculate the missing input (3) and output numbers in the flow diagram . Input numbers No. of candl
The intensity of the sound from a certain leaf blower is measured at 36 × 10^-2 W/m?. Find the decibel level.
que va a hacer en las proximos anos infinito
Please folllowe mee33​
This table shows four examples of experiments. Which describes who will record their measurements in joules? Lily and Henry Astrid and Bob Lily, Astrid, Henr
food and beverage service
if m1 and.m2 are the numbers of sexagesimal and centesimal
2.2.3 2.2.4 Show, by means of calculations whether the VAT calculation is correct or not correct. (3) [18]​